planInformation. planPeriod.length {#plan-info-plan-period-length}
==================================================================

The plan period length.  
The period length and unit must be included in your request. For example, to end the plan after 12 months, set the length to `12` and the unit to `M`. To end the plan after two years, set the length to `2` and the unit to `Y`.

Specifications {#plan-info-plan-period-length_Specifications}
-------------------------------------------------------------

* **Data Type:** String
* **Data Length:** 2

Mapping Information {#plan-info-plan-period-length_Mapping}
-----------------------------------------------------------

* **REST API Field:** planInformation.planPeriod.length
* **SCMP API Field:** No corresponding field.
* **Simple Order API Field:** No corresponding field.

